Rotary Cultvator / Harvester PTO Shaft With Seamless Steel Pipe And Tube
SPECIFICATION
-product name
-main material
-standard
-uses
size range(mm)
Structural Pipe
10,20,35,45,
16Mn Q345B
GB/T8162-2008
–for the general structure
6-80
Fluid Pipe
20,Q345
GB/T8163-2008
Fluid transport
8-80
Precision Tube
St35 St37.4(10#) St45(20#)St55(35#) Ck45(45#)St52(16Mn)35Cro
GB/T3639-2000
DIN2391
For the automotive, motorcycle, engineering machinery, jack, electrical tools and sporting equipment and other areas
10-80
alloy-steel pipe
15CrMo,25CrMo,30CrMo,40CrMo
DIN17175-79JISG3467-88JISG3458-88
GB5310-95 GB9948-88ASTMA335/A335mASTMA213/A213m
high-temperature resistant,
Low temperature-resistant, corrosion-resistant Seamless pipe for Petroleum, chemical, electric power,
Boiler industry
16-824×2-100
6-80
Low and medium pressure boiler tube
10,20
GB3087-1999
– for Low and Medium Pressure Boiler
-boiling tube,-motorcycle-smoke tube
6-80
Oil cracking tube
2012CrMo15CrMo
GB9948-88
–
furnace tube for Refined petroleum refining plant
-heat-exchanger tube
– Pipeline seamless pipe
6-80
high-pressure seamless pipe for chemical fertilizer equipment
20,16Mn,Q345
GB6479-2000
Fertilizer Equipment
-pipeline
6-80
Marine tube
410
GB/T5312-1999
specificial pressure pipe for vessel manufacturing
– tube for boilers and overheating
6-80
line pipe
5L GR.B, X52,X60
API
-for petroleum,natural gas, industrial dilivery(gas,water,oil)
6-80
Rectangular Tube
Q195,Q235,Q345,20#
GB/T6278-2002
Structure, decoration, construction
6-80
-square pipe
Q195,Q235,Q345,20#
GB/T6278-2002
Structure, decoration, construction
Wrappedwithpolywovenbags,weusesteelbelttopacktheoutside,polywoodencasesorwoodenboxesforthinwallthicknesscanbeofferedifrequired
1. How long will it take to produce an order?It is within 30days for the purchasing and production time with container order and 10days for the sample.2. What is your minimum order?Usually 2ton for each size3. What form of quotation do you offer?FOB Tianjin, CIF and CNF Your destination
4. What is your payment term?Payment is 30% deposit, 70% before shipment
5. Does the sample for free or not?The samples are free if they are common sizes, You need to pay for the freight .