Yx3 manufacturer made in China – replacement parts – in San Juan Puerto Rico 80-4 0.75kw High Efficienct Three Phase AC Induction Electric Motor with top quality

Yx3  manufacturer  made in China - replacement parts -  in San Juan Puerto Rico  80-4 .75kw Substantial Efficienct 3 Section AC Induction Electrical Motor with leading good quality

We – EPG Team the largest gearbox & motors , couplings and gears manufacturing facility in China with 5 diverse branches. For much more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

 


Y2 Motor Features

Y2 sequence electric powered motor are entirely enclosed and admirer cooled(TEFC),a few-section squire cage induction motor, developed type of Y series electries motors with new techbique. The mounting dimension is conformend with the appropriate demands of IEC specifications.

Y2 sequence electrical motor are with gorgeous figure,compact construction,low sound,high effectiveness,big starting up torque,easy operation,and so on.The motors are adopted with insulation class F and pretrction classip54.These motors are up to the intercontinental standard of nineties.

Y2 sequence electric powered motors are extensively used in many areas,these kinds of as HVAC,drilling equipment,pumps,enthusiasts,winches,air compressors,floor cleansing machines,transportation equipment,foodstuff machines,agriculture machines aand equipments, and so on

Observe:we can also make custom-made motors in accordance to clients’special  demands,this sort of as 50hz,60hz,380v,400v,415, 460v,575v,660v: IP55
Insulation course :F.H.

one.In depth Product Description

one.CE certificate 
two.Copper wire 
three.Cold-rolled silicon metal sheet

2.Requirements

1. Silicon metal DR510, 800, 600, 360 regular use stamping of lamination stator and rotor die-casting
2. 100% copper winding and inserting stator (manual and semi-automatically)
three. Stator Vacuum impregnation and drying
4. CNC machining motor shaft, body, end shields, and so on
five. Expert workman inspecting spare parts each and every processing
six. Electric powered motor assembly product line
seven. Electric motor will 100% test prior to portray. 
eight. Electric powered motor spray-paint on motor portray merchandise line
nine. Electrical motor will one hundred% verify once again before packing. 
An electric motor from materials to finish motor, need to go 15 time check, and a hundred% screening, output electrical power,voltage,
electrical recent, non-load, 50% load, 75% load, one hundred% load and check the nameplate, packing.
Last but not least shipping to our client.

three.Complex Knowledge

Type Output Recent (A) Speed Eff. Electrical power
Factor
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-two .18 .twenty five .53 .50 2720 sixty five .8 five.5 2.2 two.2
Y2E1-632-2 .25 .34 .sixty nine .66 2720 68 .eighty one 6.five two.two 2.two
Y2E1-711-two .37 .5 .99 .ninety four 2740 70 .eighty one 7 two.2 2.2
Y2E1-712-2 .fifty five .seventy five 1.forty one.33 2740 seventy three .eighty two 7 two.2 2.three
Y2E1-801-2 .seventy five 1 one.83 1.74 2830 75 .83 seven.five 2.two two.three
Y2E1-802-two 1.one one.5 2.fifty eight 2.45 2830 77 .eighty four seven.nine two.two two.three
Y2E1-90S-2 1.5 two three.43 3.26 2840 seventy nine .eighty four seven.5 two.2 2.three
Y2E1-90L-two two.2 three four.85 four.sixty one 2840 eighty one .85 7.five 2.2 two.3
Y2E1-100L-2 3 4 six.31 six.00 2870 83 .87 7.five 2.two 2.three
Y2E1-112M-2 four five.five eight.twelve seven.72 2880 85 .88 seven.five 2.two 2.3
Y2E1-132S1-2 5.five 7.5 eleven.04 ten.forty nine 2900 86 .88 7.5 two.two 2.three
Y2E1-132S2-2 seven.5 ten 14.88 14.14 2900 87 .88 7.5 2 two.3
Y2E1-160M1-2 eleven 15 21.34 20.27 2940 88 .89 7.5 two two.three
Y2E1-160M2-2 fifteen twenty 28.seventy seven 27.33 2940 89 .89 seven.five 2 2.3
Y2E1-160L-two 18.5 twenty five 34.70 32.97 2940 90 .9 seven.5 2 two.three
Y2E1-180M-2 22 30 41.27 39.20 2940 90 .nine seven.five two 2.2
Y2E1-200L1-2 30 40 fifty five.53 52.seventy five 2950 91.2 .nine 7.five two 2.two
Y2E1-200L2-2 37 fifty sixty seven.89 64.fifty 2950 92 .9 7.5 two 2.2
Y2E1-225M-2 45 60 eighty two.thirteen seventy eight.02 2970 92.three .9 7.five two 2.two
Y2E1-250M-2 55 75 ninety nine.84 94.eighty five 2970 ninety two.five .9 seven.5 2 2.2
Y2E1-280S-2 seventy five a hundred 134.98 128.23 2970 93 .9 seven.five 2 2.two
Y2E1-280M-2 90 125 161.63 153.fifty five 2980 93.eight .nine seven.five two two.two
Y2E1-315S-two a hundred and ten a hundred and fifty 194.35 184.sixty three 2980 94 .ninety one 7.1 one.8 2.two
Y2E1-315M-two 132 a hundred and eighty 232.97 221.32 2980 94.five .91 7.1 one.8 two.two
Y2E1-315L1-2 a hundred and sixty 220 278.73 264.seventy nine 2980 ninety four.six .92 7.1 one.eight two.2
Y2E1-315L2-2 two hundred 270 346.58 329.twenty five 2980 94.8 .ninety two seven.1 1.8 2.two
Y2E1-355M-2 250 340 431.87 410.27 2980 95.3 .ninety two seven.one one.six 2.2
Y2E1-355L-two 315 420 544.fifteen 516.ninety four 2980 95.6 .92 seven.one one.six two.two
Y2E1-631-4 .twelve .sixteen .44 .42 1310 57 .72 five.two two.4 two.two
Y2E1-632-4 .eighteen .25 .sixty two .fifty nine 1310 sixty .seventy three 5.two 2.4 two.2
Y2E1-711-4 .25 .34 .seventy nine .seventy five 1330 65 .seventy four five.2 2.four 2.two
Y2E1-712-4 .37 .five 1.thirteen 1.08 1330 sixty seven .74 five.two two.four 2.2
Y2E1-801-four .fifty five .75 1.55 1.forty seven 1440 71 .76 5.seven 2.4 two.3
Y2E1-802-four .seventy five one two.03 1.ninety three 1440 73 .seventy seven 6 two.three 2.3
Y2E1-90S-four one.one 1.five 2.89 2.seventy five 1400 75 .77 6 two.three two.3
Y2E1-90L-four one.five two 3.70 three.fifty one 1400 seventy eight .seventy nine 6 2.three two.three
Y2E1-100L1-four two.2 3 5.16 four.ninety 1430 80 .eighty one seven two.three 2.three
Y2E1-100L2-4 3 4 6.78 six.44 1430 82 .eighty two seven two.3 two.three
Y2E1-112M-4 4 5.five 8.82 eight.38 1435 84 .82 seven two.3 2.three
Y2E1-132S-four five.5 seven.five eleven.84 11.twenty five 1440 eighty five .eighty three seven 2.3 two.three
Y2E1-132M-four 7.5 ten 15.fifty nine fourteen.eighty one 1440 87 .84 7 two.three two.3
Y2E1-160M-four eleven 15 22.61 21.48 1470 88 .84 7 2.two 2.three
Y2E1-160L-4 fifteen 20 thirty.13 28.62 1470 89 .eighty five 7 two.2 two.three
Y2-180M-four 18.five 25 36.11 34.31 1460 ninety.5 .86 7 two.two two.three
Y2-180L-4 22 30 forty two.71 forty.fifty eight 1460 91 .86 7.5 two.2 2.3
Y2-200L-four 30 40 57.sixty one fifty four.73 1470 ninety two .86 seven.5 2.two two.three
Y2-225S-4 37 fifty sixty nine.eighty five sixty six.36 1470 ninety two.five .87 7.5 2.two 2.three
Y2-225M-4 45 60 eighty four.sixty eight eighty.forty five 1470 ninety two.8 .87 seven.five two.2 2.three
Y2-250M-four 55 seventy five 103.28 98.12 1470 ninety three .87 7.2 2.two 2.3
Y2-280S-four seventy five 100 139.sixty four 132.65 1480 ninety three.eight .87 7.two 2.two two.three
Y2-280M-four ninety a hundred twenty five 166.85 158.fifty one 1480 94.2 .87 seven.two two.two two.3
Y2-315S-4 a hundred and ten one hundred fifty 200.ninety seven a hundred ninety.ninety two 1480 94.5 .88 seven.two two.2 two.three
Y2-315M-four 132 a hundred and eighty 240.40 228.38 1485 ninety four.8 .88 seven.2 two.one 2.three
Y2-315L1-4 a hundred and sixty 220 291.09 276.54 1485 94.9 .88 6.nine two.1 two.three
Y2-315L2-4 200 270 359.forty 341.43 1485 ninety five .89 six.nine two.one two.three
Y2-355M-4 250 340 442.eighty five 420.71 1490 ninety five.3 .9 6.nine 2.1 2.2
Y2-355L-4 315 420 556.24 528.43 1485 ninety five.6 .9 six.nine two.one 2.2
Y2E1-711-six .eighteen .25 .74 .70 850 fifty six .sixty six four 1.nine two
Y2E1-712-6 .25 .34 .ninety five .90 850 59 .sixty eight four 1.9 two
Y2E1-801-6 .37 .5 1.30 1.23 890 62 .7 four.7 1.nine two
Y2E1-802-six .55 .seventy five one.seventy nine one.70 890 65 .72 four.7 1.9 2
Y2E1-90S-six .75 one 2.eighteen 2.07 910 seventy two.seven .72 5.5 2 two.one
Y2E1-90L-6 one.one 1.5 3.01 two.86 910 76 .73 5.five two two.1
Y2E1-100L-six one.five two 3.85 3.65 940 seventy nine .75 5.5 two 2.one
Y2E1-112M-six 2.two three five.43 5.sixteen 940 eighty one .76 6.five two 2.one
Y2E1-132S-6 3 four 7.31 six.95 960 eighty two .76 six.5 two.1 two.one
Y2E1-132M1-6 four 5.five 9.fifty two 9.04 960 84 .76 6.5 two.1 2.1
Y2E1-132M2-six five.5 seven.five twelve.62 11.99 960 86 .77 six.5 2.one two.1
Y2E1-160M-6 seven.5 10 sixteen.ninety one 16.07 970 87.5 .77 6.five 2 2.one
Y2E1-160L-six 11 fifteen 23.18 22.02 970 89 .eighty one 6.5 2 two.one
Y2E1-180L-6 fifteen twenty 31.26 29.70 980 ninety .eighty one six.5 two.1 2
Y2E1-200L1-6 18.5 twenty five 37.63 35.75 980 90 .83 six.5 2.one two
Y2E1-200L2-six 22 30 43.twenty five forty one.09 980 ninety two .eighty four seven 2.one two
Y2E1-225M-6 thirty 40 57.30 54.43 980 92.five .86 seven two.1 two
Y2E1-250M-6 37 fifty 70.44 sixty six.ninety two 980 92.8 .86 7 2 two
Y2E1-280S-six forty five 60 eighty five.03 eighty.78 990 ninety three.5 .86 7 2 two
Y2E1-280M-six 55 75 103.59 ninety eight.41 990 ninety three.eight .86 7 two 2
Y2E1-315S-six 75 a hundred 139.34 132.37 990 94 .87 6.7 2 2
Y2E1-315M-6 90 one hundred twenty five 168.seventy nine 160.35 990 ninety four.two .86 6.seven 2 two
Y2E1-315L1-six one hundred ten one hundred fifty two hundred.97 190.ninety two 990 94.5 .88 six.seven two two
Y2E1-315L2-six 132 180 240.sixty six 228.62 990 ninety four.7 .88 six.7 1.9 2
Y2E1-355M1-six 160 220 292.01 277.41 990 94.six .88 six.seven 1.nine two
Y2E1-355M2-six 200 270 363.86 345.sixty seven 990 ninety four.9 .88 six.seven one.nine two.one

Why us? 

one.Low MOQ: It can meet your marketing organization quite effectively.
  
two.Excellent Provider : We treat clientele as buddies,supplying 24 hrs a days 7days a week service support.

 three.Good Top quality :We have strict good quality management technique.Good popularity in the marketplace.
 
four.Fast & Cheap Shipping and delivery: We have huge price cut from forwarder.

FAQ

Q: Do you provide OEM services?

A: Yes 

Q: What is your payment phrase?

A: thirty% T/T in progress, 70% equilibrium when acquiring B/L copy.  Or irrevocable L/C.

Q: What is your direct time?

A: About 30 days soon after getting deposit or authentic L/C.

 

 

The use of first gear manufacturer’s (OEM) component quantities or logos , e.g. CASE® and John Deere® are for reference reasons only and for indicating product use and compatibility. Our business and the listed substitution elements contained herein are not sponsored, accredited, or created by the OEM.

Yx3  manufacturer  made in China - replacement parts -  in San Juan Puerto Rico  80-4 .75kw Substantial Efficienct 3 Section AC Induction Electrical Motor with top good quality

Yx3  manufacturer  made in China - replacement parts -  in San Juan Puerto Rico  80-4 .75kw High Efficienct Three Period AC Induction Electric Motor with top good quality

pto yoke

As one of leading pto yoke manufacturers, suppliers and exporters of mechanical products, We offer pto yoke and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of pto yoke

Recent Posts