PTO Shaft Triangle Lemon HEX Shaped Seamless Steel Tube and Pipe

Overview
Quick Details
Standard:
GB
Standard2:
GB 5310-1995, GB 3087-1999, GB/T 8163-1999, GB/T 8162-1999, GB 9948-2006
Grade Group:
16Mn, Q195-Q345, ST35-ST52
Grade:

PTO Shaft Triangle Lemon HEX Shaped Seamless Steel Tube and Pipe

PTO shaft, PTO drive shaft, driveline, agricultural drive shaft

1. We provide pto shaft pipe

TRIANGLE series 2#, 4#, 6#, 7#

T70 53.6*3.8 44.7*5.5

T60 53.6*3.8 44.7*4

T40 43.4*3.3 36.1*4.4

T20 36*3.2 29*4

2. Types of tube: Triangle/lemon/hexgonal profile tube3. Minimum overall length: 6000-12000mm or ,14”,16”,19”,23"-70" 4. Process:cold drawn5.ST52 chemical components:(%)

C:max0.20 Si:0.4-0.7 Mn:1.00-1.60 P,S:max0.035

Q235 chemical components:(%)

C:max0.20 Si:0.4-0.7 Mn:0.35-0.65 P,S:max0.035

20# chemical components:(%)

C:max0.20 Si:0.17-0.37 Mn:0.35-0.65 P,S:max0.035

We also provide splined shaft. If you have any interest, please don’t hesitate to let us know.

Certifications

Passed the ISO9001:2008 quality system authentication and are applying the TS16949:2009 authentication.

Product use

Our company is a professional seamless steel pipe production factories,

products are mainly appliedin auto parts manufacturing.

Machinery and equipment manufacturing, equipment manufacturing industries such as agriculture, provide steel pipe for many world class companies,Also provide most of the steel pipe products for Chinese vehicles, cooperate with customers to develop different shape and material of products.

Packaging & Shipping

Packing&Delivery

Bundle with strong steel strips, wrapped with plastic film and woven bags outside or at two ends,also according to your requirement.Our compony has the fixed logistics that have long-term cooperation with us, the time of delivery is about 30 days after the order.

Our Services

Fast delivery&Good service:There is convenient traffic and fast logistics here,we also have fixed motorcade which have long-term cooperation with us.We Have The Most Powerful worker team For You To Ensure Products Quality, Have The Most Professional Team to service you.

FAQ

About the sample:

The sample production cycle is about 15 days.

No more than 10kg of samples are provided free of charge, the customer will pay the express fee.

New product development process:

1.

According to the customer’s requirements and the characteristics of the finished products, we will make samples for customer testing, including materials, mechanical properties and processing;

2.

1 ton -3 tons small batch test, adjust the process and check the stability consistency of the craft;3.

To test the batch process in batches of about 10 tons.Finally, the production process is set in mass production.

pto yoke

As one of leading pto yoke manufacturers, suppliers and exporters of mechanical products, We offer pto yoke and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of pto yoke

Recent Posts