We – EPG Group the most significant agricultural gearbox and pto manufacturing unit in China with 5 different branches. For far more information: Cellular/whatsapp/telegram/Kakao us at: 0086-13083988828
pto shaft stock EPG volvo penta push shaft specializing 06 gto driveshaft in pto shaft for woods bush hog the pto shaft hs code manufacture pto push shaft of 2007 dodge charger travel shaft rotocultivator gsp driveshafts ploughshares bolt on pto shaft and tractor pto overrun clutch other non-standardized farm equipment reducing resources. It is our intention to offer a huge variety of good quality products at affordable costs, provide the ideal provider for consumers pleased and contribute to our ongoing advancement.
Business profile
EPT was recognized on Jan., 2007, we have a lot more than eighty employees and a lot more than 20% of them are specialised specialized staff. Coming alongside the way, EPT has turn into a specialist company and exporter in precision shaft, micro shaft, motor shaft, stainless metal shaft, non-stHangZhourd shaft and components components. The items are utilised in numerous fields this sort of as home equipment, micro motor, computer, scanner, printer, communication, vehicle and machinery equipment and instrument and so on. |
|
We passed IATF16949:2016 Quality Management System Certification:
We passed ISO9001:2015 Quality Management System Certification.
FAQ:
1,How can I get samples?
If sample value under twenty$,we can send by free of demand.In any other case we would cost samples.
For Sample delivery, it really is much better if buyer can have collect courier account amount.
Or buyer can organize nearby courier firm to decide up samples from our factory.
Also we can arrange in our facet and demand courier charges appropriately. Any even more question,p EPT publish to our e mail box!
2,What is the leadtime for sample order ?
ten-fifteen days after acquiring your sample buy.
3,What is leadtime for mass amount ?
It truly is count on the amount.
For illustration: If the amount as 10000pcs, 15 days for the leadtime right after acquiring PO.
4,Payment Phrases:
1.a hundred% T/T in EPT (thirty% deposit,balance paid out ahead of shipment).
two.100% T/T (thirty% deposit, equilibrium 30 days following B/L date),but masking CITIC.
three.L/C
4.D/P
5.D/A
six.Paypal
five,What is your minimum order quantity for the items in the order?
2000pcs for each size except for sample.
six,Are you a trading company or manufacturer?
We are a manufacturer, specialized in producing and exporting various shafts and pins