We – EPG Team the most significant gearbox & motors , torque limiter couplings and gears factory in China with 5 distinct branches. For a lot more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Product DESCRIPTIONS
5 Ton Truck-mounted crane
A truck-mounted crane is grouped together as a means of transportation. By the boom, lifting torque, frame, legs and other
parts. Crane left and appropriate procedure can be the two good and negative 360-diploma rotation, can also be entire rotation.
In comparison unique crane vans with crane, with a high velocity, climbing ability characteristics. Allows quickly actions,
effectiveness, energy-conserving.With a flexible, simple to work, efficient, protected, and reputable.
A truck-mounted crane is grouped collectively as a means of transport. By the increase, lifting torque, frame, legs and other components.
Crane left and correct operation can be equally positive and damaging 360-degree rotation, can also be full rotation. In comparison
particular crane vehicles with crane, with a high speed, climbing capacity qualities. Allows quickly movements, performance,
strength-preserving.With a flexible, effortless to function, successful, secure, and trustworthy.
Technical PARAMETERS
Merchandise | Unit | References |
Max Lifting Second | t*m | twelve.five |
Max Lifting Capacity | kg | 5000 |
Increase Duration | m | four.09~11.2 |
Max Lifting Height | m | 12.six |
Derrick assortment | ° | ~75° |
Outrigger span | mm | 2280~5100 |
Dimension(length×width×height) | mm | 4365×2430×3017 |
1.Throttle Management Program
Changing the form of the previous manipulation and throttle procedure independently, the Realization of the bilateral
take care of synchronous and driving throttle acceleration and deceleration routinely, due to the pace modify steady,
it can effortlessly carry out the lifting perform.
two.Conclude placement automated hook system
Maximum savings in preparing time just before and after the operation, to ensure that the customer’s motor vehicle could be in a
driving condition in the shortest time and avoid crane hurt accident brought on by hoist swing to enhance the basic safety of driving.
three. Hoisting overwinter device
If a user is negligent or unfamiliar with the procedure of lifting hooks, the hoisting overwinter unit will stop hook-raise
in time, to avert the security of personnel and property triggered by the fracture of wire rope.
four.Slewing loc ept system
Slewing loc ept unit can guarantee that the lifting arm does not sway since of the centrifugal force for the duration of the driving
and steering approach of the car,to avoid all types of mishaps induced by swaying.
5.Torque limiter
It can choose a torque restrict overload protection system to avoid end users due to the fact of negligence or unfamiliar with the lifting
procedure theory of overload operation, therefore leading to the vehicle rollover and crane injury accidents.
The use of original products manufacturer’s (OEM) element figures or logos , e.g. CASE® and John Deere® aSlip can also take place in the reverse course, so that the enter associates would slip to avoid the torque overload from transmitting to the output part.re for reference purposes only and for indicating solution use and compatibility. Our organization and the shown substitute components contained herein are not sponsored, accepted, or manufactured by the OEM.